New Arrivals/Restock

DC 5V Micro 15mm Stepper Stepping Motor 90mm Long Lead Linear Screw Nut Slider 2-phase 4-wire 15.5 Ohms DIY 3D printer

flash sale iconLimited Time Sale
Until the end
07
15
38

$27.17 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
New  $45.29
quantity

Product details

Management number 211203871 Release Date 2026/04/04 List Price $18.12 Model Number 211203871
Category

Specifications:Driving voltage: DC4-9V/100-500mA 2-phase 4-wireMotor diameter: 15mmLength of screw rod: 90mmSlide stroke: 80mmScrew thread pitch: 0.5mmScrew diameter: 3mmMotor diameter: 15mmPhase Resistance: 15.5 OhmsBlue A+ black A- red B+ yellow B-Package includes:Mini Long Screw Stepper Motor x 1pcItem specifics:Phase: 2Type: Permanent MagnetCertification: NONEOrigin: Mainland ChinaCondition: NewModel: Mini 15mm Stepper MotorResistance per phase: 15.5 ohmsWiring configuration: 4-Wire BipolarCountry/region of manufacture: ChinaCurrent type: DCFull step angle: 18Shaft diameter: 3mmNominal rated input voltage: 5V

  • Package Includes: Mini Long Screw Stepper Motor x 1pc
  • Phase: 2
  • Type: Permanent Magnet
  • Certification: NONE
  • Origin: Mainland China
Brand Name Generic
Unit Count 1.0 Count
Manufacturer DAVITU

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review